GENERAL WARNING

1 Doc

Installation

Last Updated: 03/03/2026

The system is pre-assembled and tested at Probot Systems. On-site installation typically takes one day with two people minimum. ⚠️ Before You Begin Read all safety instructions. Verify delivery against scope of delivery. Ensure site meets environmental conditions. All dimensions in mm unless specified. Required Tools (Not Included) Site Preparation Uncrating and Positioning Electrical Connections Pneumatic...

Safety

Last Updated: 03/03/2026

🚨 Danger A collision between a person and the palletizer may result in material damage, bodily injury, or death. Ensure adequate clearance and that no person is within the work area before starting. Disclaimer The installer is responsible for safe installation and commissioning. Probot Systems accepts no liability for damage or injury incurred from improper use....

Get a Quote

Fill out the form below, and we will be in touch shortly.

Contact Information
Your project
In order to provide you the content requested, we need to store and process your personal data. If you consent to us storing your personal data for this purpose, please tick the checkbox below.

Subscribe to our newsletter!

Receive our latest news, events and blog posts.